Due to bad weather, the last phase of the construction of the hotel had exceeded the predefined dates, leading to the work of soil shaping the surrounding area and irrigation late and in Palm Sunday afternoon.
With the activation of the owners and local "heroes" and the use of a 800 m² plastic cover, the soil arranging works were done, the irrigation network was constructed and the turf was installed until Holy Wednesday night.